Case Studies

Bid leveling: 15 hours to 20 minutes

The estimating team stopped assembling spreadsheets and went back to judgment.

Renata Pinheiro
Renata Pinheiro
3 min read
How the work runs
AI gathers and flags
Human decides
01
Read every bid
Any format, any structure. PDF, Excel, Word, turnkey or itemized.
02
Line up the scope
Every proposal laid out trade by trade in one shape.
03
Compare item by item
Included, excluded, priced separately, or not addressed.
04
Flag the exceptions
Scope gaps, commercial risk, and the questions only a person can answer.
05
The estimator decides
The tool never picks a winner and never touches the budget.
15 hrs
Per package, by hand
20 min
Per package now
98%
Reduction in leveling time

A general contractor's estimators were spending 15 hours leveling each set of subcontractor bids by hand. Now it takes about 20 minutes, a 98% reduction, and the estimator still makes every call.

The problem

Sub bids arrive in every format (PDF, Excel, Word) and every structure (turnkey, itemized, or a single lump sum). Before any judgment could happen, the team spent about 15 hours per package pulling numbers out of each proposal, lining up scope, and building the side-by-side by hand. Slow, and easy for a buried exclusion or a mismatched plan date to slip through.

What we built

A tool the estimating team runs themselves. It reads every bid in any format, lays them out trade by trade, and shows, item by item, whether each scope line is included, excluded, priced separately, or not addressed. Then it flags what deserves attention:

It never picks a winner and never touches the budget. AI gathers and flags; the estimator reviews and decides.

The result

Fifteen hours down to about twenty minutes per package. The estimator opens a finished comparison with the exceptions and questions already surfaced, and spends the time on the judgment that decides the buy instead of assembling spreadsheets.

Renata Pinheiro
Renata Pinheiro

Founder of The Alignment Lab. Twenty years spent working inside construction companies rather than consulting to them from the outside, at McCarthy, Odebrecht, and American Constructors, across strategy, communications, and change management.

More about us
Could this work for your team?

Bid leveling is one of the workflows we build for mid-market contractors

If work like this is taking up your team's days, book a 30-minute conversation about where AI fits your operation.